| Place of Origin: | Guangdong, China |
| Brand Name: | SENONE / OEM / Neutral |
| Certification: | RoHS / FCC /CE |
| Model Number: | SCR-300 |
| Type: | Other Type | Interface: | Usb |
|---|---|---|---|
| Card Slots: | Single Phase | Installation: | Internal |
| Material: | ABS | Support Card: | SD TF Memory Card Reader |
| Host Interface: | USB 2.0 CCID1 (also Compliant With USB 1.1) | Transmission Speed: | 12 Mbps (USB 2.0 Full Speed) |
| Standards: | ISO 7816 & EMV2 2000 Level 1 | Protocols: | T=0, T=1, SLE 4432/42 (S=10), SLE 4418/28 (S=9), I2C (S=8) |
| Card Size: | ID-1 (full-size) | Smart Card Interface Speed: | 420 Kbps (when Supported By Card) |
| Smart Card Clock Frequency: | Up To 5 MHZ | Supported Card Types: | 5V, 3V And 1.8V Smart Cards ISO 7816 Class A, AB And C |
| Power To Smart Card: | 60Ma |
Support card type | 5V, 3V and 1.8V smart cards, ISO 7816 Class A, AB and C. | ||||||
Interface Type | USB 2.0 CCID1 (also compliant with USB 1.1) | ||||||
Transfer speed | 12Mbps | ||||||
Line length | 47.24inch | ||||||
Certification standards | ISO-7816 and EMV2 2000 Level 1, CE, FCC, VCCI, CCID, Microsoft WHQL | ||||||
Durability | 100,000 times | ||||||
Secondary development | Support multi-language development, provide routines | ||||||
operating system | Windows 10, 8, 7 (32/64 bit), Windows XP, Vista (32/64 bit), Windows Server 2003/2008 (32/64 bit). | ||||||
Operating temperature | 0-55℃/32-131℉ | ||||||
Product Size | 3.36inch*2.56inch*1.02inch | ||||||
Package dimensions | 96*103*25mm | ||||||
Contact Person: ec13510458669
Tel: +8613510458669
Keyboard with Smart Card Reader
Keyboard with Smart Card Reader
Best Selling Low Profile Smart Card USB Keyboard Smart Card Reader USB Keyboard
104 Keys USB Interface Multi-language Standard Wired Office with Smart Card ReaderKeyboard